There were 6 uptime checks of govisual.ru conducted throughout the 1 211 day period beginning on October 25, 2021. From the entirety of checks conducted, govisual.ru was operable 6 times, with the most recent occurrence on January 27, 2025, resulting in a code 200 status. Inspections have revealed that as of February 18, 2025, there have been no reports of govisual.ru being down. As of February 18, 2025, every response has been received, confirming that none of the them contain error statuses. Against an average of 0.257 seconds, govisual.ru replied in 0.246 seconds on January 27, 2025.